Okay, so my wife and I went out tonight and picked up (what we think is) all of the materials for the shelves.
 |
The Lowes Carpentry associate making the cuts for me. |
 |
The shelves cut to length. |
 |
A 1" x 6" x 12' just before being cut down. |
So we started with the shelves and within twenty minutes we had the boards we needed.
 |
All of the stuff from Lowes loaded into the back of the van. Total there was just short of $140.00
Then we went to WalMart and got a few odds and ends that we didn't feel like paying Lowes prices for. Between stain, a tape measure, foam brushes and some screws, the total was $22.00.
|
 |
This is the sum total of everything we purchased tonight, Walmart and Lowes..
So, tomorrow will be the pre-build, where we sand and stain shelves... all ten of them. |
No comments:
Post a Comment